Project: Sportsman   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Kyle Stone   -  
Project:   Glasair - Sportsman 2+2   -   VIEW REPORTS
Total Hours:1859.9
Start/Last Date:Jul 03, 2019 - Jun 30, 2022
Engine:Lycoming IO-390-EXP
Panel:Garmin G3X w/ GNX375 IFR nav, GNC 255 NAV/COM
 
Friendly URL: https://eaabuilderslog.org?s=Sportsman

Home or Last Project Picture

Jun 09, 2020     Step #56 - drill trailing edge - (1 hour) Category: Flaps (VII)
All went well. I put double sided tape on one side to hold the shim in place while drilling. The only issue I have is the LWR skin is not flush with the aft side of the shim. I'm not sure how to fix this as I don't see where the extra metal could have come from. The edge margin is right at the minimum (3/16��o I'm still good with edge margin.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.